Olivers Driveshaft Replace CV Front Drive Shaft

Introduction to Olivers Driveshaft Replace CV Front Drive Shaft

Olivers Driveshaft Replace CV Front Drive Shaft is a double universal joint CV drive shaft that is specifically designed for TJ herders with 2-4.5″ suspension elevators (non-Rubicon, non-long arm lifting) with factory rear differential. This driveshaft is designed to prevent the vibration of the drive train after installation of the elevator and reduce the angle of the drive train. The strength and design of this drive shaft is superior to the factory drive shaft. It is made of 2″ .120 wall DOM tubing and has a long travel slip and stub used.

Usage Scenarios

Olivers Driveshaft Replace CV Front Drive Shaft is primarily used in front engine rear vehicles to transmit the transmission's rotation to the main reducer. It is an integral part of the power transmission of the automobile. The drive shaft of special vehicles is mainly used in oil tank trucks, fuel trucks, sprinkler trucks, sewage suction trucks, manure suction trucks, fire trucks, high-pressure cleaning trucks, road obstacle removal vehicles, aerial work vehicles, and garbage trucks, and other vehicles.

Benefits of Olivers Driveshaft Replace CV Front Drive Shaft

The benefits of Olivers Driveshaft Replace CV Front Drive Shaft include its superior strength and design compared to the factory drive shaft, its ability to prevent vibration of the drive train after installation of the elevator, and its ability to reduce the angle of the drive train. It is made of 2″ .120 wall DOM tubing and has a long travel slip and stub used.

Materials that can be used with Olivers Driveshaft Replace CV Front Drive Shaft

Olivers Driveshaft Replace CV Front Drive Shaft is designed to be used with Sye in TJ herders with 2-4.5″ suspension elevators. It is also designed to be used with factory rear differential.

Installation, Maintenance, Repair, and Replacement of Olivers Driveshaft Replace CV Front Drive Shaft

Installation, maintenance, repair, and replacement of Olivers Driveshaft Replace CV Front Drive Shaft should be done by a professional mechanic. Before installation, the driveshaft should be subject to a dynamic balancing test and adjusted on the balancing machine. Proper lubrication and tightening of all bolts and nuts are essential for maintenance. In case of damage or failure of the driveshaft, it is recommended to replace the driveshaft with a new one.

Quality Products, Favorable Prices, and Attentive Service from EVER-POWER GROUP

EVER-POWER GROUP is committed to providing high-quality products, favorable prices, and attentive service to all customers. Our Olivers Driveshaft Replace CV Front Drive Shaft is made of the highest-quality materials and is designed to provide superior performance when compared to the factory drive shaft. We welcome customers to visit and customize their orders according to their needs.

FAQ

  1. What is Olivers Driveshaft Replace CV Front Drive Shaft?
  2. What is the benefit of using Olivers Driveshaft Replace CV Front Drive Shaft?
  3. What is the material used in Olivers Driveshaft Replace CV Front Drive Shaft?
  4. How to install Olivers Driveshaft Replace CV Front Drive Shaft?
  5. What is the warranty of Olivers Driveshaft Replace CV Front Drive Shaft?

Note: All the content on this page is from the Internet and is only for reference for product selection. We are not the original trademark holder. Our products are only applicable to aftermarket replacement parts rather than original parts. If you need to buy original spare parts, please contact the original factory to buy.

Contact us for More information → https://www.ever-power.net/contact-us/

You are always welcome to ask any information! Please feel free to contact us!

MATERIALS AVAILABLE

1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6. Aluminum: Al6061, Al6063
7.OEM according to your request

SURFACE TREATMENT

Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.

PROCESSING METHOD

CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly

QC & CERTIFICATE

Technicians self-check in production,final-check before package by professional Quality inspector

ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009

PACKAGE & LEAD TIME

Size: Drawings

Wooden Case/Container and pallet, or as per customized specifications.

15-25days samples. 30-45days offcial order